ENERGY INTELLIGENCE LIBRARY
Tune installation & electrical fit
Fast installation only matters if the panel is actually compatible and the work is handled safely.

The practical installation profile
- Installed at eligible electrical panels by qualified electrical personnel.
- Typical field installation is roughly 15 minutes per panel, with site conditions varying.
- Many installations can be performed with the panel remaining energized, subject to customer policy, electrician procedure, and local requirements.
- No recurring software subscription or routine device-maintenance program.
- 10-year product warranty.
Electrical pre-qualification
Orion screens panel count, system topology, neutral availability, load profile, installation requirements, and whether the customer or site requires de-energization. Single-phase systems and 3-phase 4-wire systems with a neutral can be candidates; a 3-phase 3-wire delta configuration without a neutral is not.
Why panel count matters
Because Tune is deployed at eligible panels, total installation scope depends on the electrical distribution system. A first-pass panel count—or even a one-line or panel schedule—helps Orion estimate scope and determine whether a pilot can lead to a meaningful broader deployment.
A PRACTICAL NEXT STEP
Ready to improve your electrical system?
Talk with Orion about your facility, energy costs, electrical system and what you want to improve. We’ll help identify the most practical path.
