ELECTRICAL EFFICIENCY LIBRARY

HOW LONG SHOULD AN ENERGY PILOT RUN?

The right test is the shortest test that still produces decision-grade evidence.

Stable loads can be fast

A stable lighting panel or other repeatable controlled load may show a useful signal in hours or days if the comparison is well designed.

Variable facilities require more time

HVAC, refrigeration, manufacturing, occupancy, weather, or production variability can require multi-day or multi-week observation to separate a technology effect from normal operations.

Whole-facility work raises the bar

The larger the measurement boundary, the more variables enter the analysis. EcoMAXIM and other whole-site projects generally justify more rigorous baseline and post-install measurement than a targeted panel test.

A PRACTICAL NEXT STEP

Ready to improve your electrical system?

Talk with Orion about your facility, energy costs, electrical system and what you want to improve. We’ll help identify the most practical path.