FACILITY TYPE
HOSPITALITY & ENTERTAINMENT
Mixed-use, long-hour facilities can create multiple electrical opportunities.

COMMON OPPORTUNITIES
What Orion evaluates first.
- Large HVAC and central plant loads
- Gaming, arena, AV, LED lighting, kitchens, and controls
- Elevators, refrigeration, and electronic systems
- 24/7 operations and high energy spend
Our rule
Your facility type helps us know where to look. Your electrical system tells us what fits.
The answer may be one technology, a combination, or no project at all.
POTENTIAL TECHNOLOGY FIT
Possible paths—not predetermined products.
Tune
Often the first technology to evaluate across hotel, casino, entertainment, lighting and electronic panel loads; South Point Casino & Arena provides an Orion case study.
EC Unit
May become relevant where refrigeration, motors or other demanding three-phase loads dominate a specific part of the facility.
EcoMAXIM
Potential fit for very large casino resorts, arenas, convention campuses and other major energy real estate with the right electrical topology.
RELEVANT EVIDENCE
What we can learn from similar facilities.
South Point Casino & Arena is one of Orion’s strongest measured Tune proof points; Power Shaver also publishes historical hospitality USES results.
A PRACTICAL NEXT STEP
Ready to improve your electrical system?
Talk with Orion about your facility, energy costs, electrical system and what you want to improve. We’ll help identify the most practical path.
