RESULTS
REAL FACILITIES.
REAL-WORLD RESULTS.
Orion distinguishes its own measured work from vendor-published historical evidence. Every result should be understood in the context of the measurement boundary, duration, operating conditions, and technology.

TUNE
Panel-level and portfolio evidence.

ORION CASE · HOSPITALITY
8.59%
South Point Casino & Arena
90-day single-panel interval test: 45 days without Tune and 45 days with Tune.
Orion case study; single-panel result, not whole-facility savings.

ORION / CUSTOMER CASE · MUNICIPAL
>19%
City of St. Anthony
Municipality-owned liquor-store pilot followed by broader city rollout.
Orion internal/customer-reported deployment evidence.

ORION / CUSTOMER CASE · COUNTY
11%
Anoka County
Validated reduction followed by countywide rollout.
Orion internal/customer-reported deployment evidence.

VENDOR-PUBLISHED · MULTI-SITE
12%+
RPM Pizza / Domino’s
Tune reports >12% savings and a broad enterprise rollout; Honeywell/Enacto also evaluated peak-demand behavior.
Source: EnergyByTune published case materials.

VENDOR-PUBLISHED · OFFICE
14.8%
Corey Center
Tune reports a third-party analysis over four years averaging 14.8% kWh reduction.
Source: EnergyByTune published case materials.
EC UNIT / USES
Longer operating history across demanding facilities.

PURE ENERGY STREAM · HEALTHCARE
25.89 kW
Kuakini Medical Center
Five EC Units; Pure Energy Stream reports a controlled on/off test with measured demand reduction.
Source: Pure Energy Stream case study; vendor-published.

POWER SHAVER / USES · MANUFACTURING
11.36%
Isola Group
12-month adjusted electricity-cost reduction plus reported production reliability improvement.
Source: Power Shaver 12-month verification summary; vendor-published.

POWER SHAVER / USES · PRINTING
24.81%
Daily Republic
Historical USES deployment with reported energy/cost and power-quality improvements.
Source: Power Shaver verified-performance materials; vendor-published.
ECOMAXIM
Technology validation now. Named facility case study next.
Pure Energy Stream states that EcoMAXIM has been validated through testing at the LADWP/LACI Advanced Prototyping Center. Orion will add a named facility case when measurement scope, customer permissions, and source data meet the site’s evidence standard.
A PRACTICAL NEXT STEP
Ready to improve your electrical system?
Talk with Orion about your facility, energy costs, electrical system and what you want to improve. We’ll help identify the most practical path.