RESULTS

REAL FACILITIES.
REAL-WORLD RESULTS.

Orion distinguishes its own measured work from vendor-published historical evidence. Every result should be understood in the context of the measurement boundary, duration, operating conditions, and technology.

Replace with approved Orion facility or technology image

TUNE

Panel-level and portfolio evidence.

South Point Casino & Arena

ORION CASE · HOSPITALITY

8.59%

South Point Casino & Arena

90-day single-panel interval test: 45 days without Tune and 45 days with Tune.

Orion case study; single-panel result, not whole-facility savings.

City of St. Anthony

ORION / CUSTOMER CASE · MUNICIPAL

>19%

City of St. Anthony

Municipality-owned liquor-store pilot followed by broader city rollout.

Orion internal/customer-reported deployment evidence.

Anoka County

ORION / CUSTOMER CASE · COUNTY

11%

Anoka County

Validated reduction followed by countywide rollout.

Orion internal/customer-reported deployment evidence.

RPM Pizza / Domino’s

VENDOR-PUBLISHED · MULTI-SITE

12%+

RPM Pizza / Domino’s

Tune reports >12% savings and a broad enterprise rollout; Honeywell/Enacto also evaluated peak-demand behavior.

Source: EnergyByTune published case materials.

Corey Center

VENDOR-PUBLISHED · OFFICE

14.8%

Corey Center

Tune reports a third-party analysis over four years averaging 14.8% kWh reduction.

Source: EnergyByTune published case materials.

EC UNIT / USES

Longer operating history across demanding facilities.

Kuakini Medical Center

PURE ENERGY STREAM · HEALTHCARE

25.89 kW

Kuakini Medical Center

Five EC Units; Pure Energy Stream reports a controlled on/off test with measured demand reduction.

Source: Pure Energy Stream case study; vendor-published.

Isola Group

POWER SHAVER / USES · MANUFACTURING

11.36%

Isola Group

12-month adjusted electricity-cost reduction plus reported production reliability improvement.

Source: Power Shaver 12-month verification summary; vendor-published.

Daily Republic

POWER SHAVER / USES · PRINTING

24.81%

Daily Republic

Historical USES deployment with reported energy/cost and power-quality improvements.

Source: Power Shaver verified-performance materials; vendor-published.

ECOMAXIM

Technology validation now. Named facility case study next.

Pure Energy Stream states that EcoMAXIM has been validated through testing at the LADWP/LACI Advanced Prototyping Center. Orion will add a named facility case when measurement scope, customer permissions, and source data meet the site’s evidence standard.