EC UNIT / USES · MANUFACTURING
ISOLA GROUP
A manufacturing facility installed USES technology to reduce energy cost and resolve recurring electrical interruptions.

11.36%
adjusted electricity-cost reduction
THE CHALLENGE
Why the facility evaluated the technology.
Isola reported power-quality conditions that regularly interrupted production and reduced revenue.
THE SOLUTION
What was deployed.
Power Shaver installed a USES Shunt Efficiency System in the Elk Grove manufacturing facility.
HOW IT WAS MEASURED
Measurement boundary and method.
Power Shaver’s 12-month verification summary says it adjusted for billing days, SMUD pricing fluctuations, and production volumes between years.
RESULT
11.36% reported reduction in electricity cost.
The same report states an 8.498% increase in unit production and elimination of power-related production interruptions for 12 months.
SOURCE & LIMITS
Read the result in context.
Power Shaver 12-month verification summary. View source →
Limitation: This is vendor-published historical evidence; the percentage is an adjusted cost reduction and should not be presented as a universal kWh result.
A PRACTICAL NEXT STEP
Ready to improve your electrical system?
Talk with Orion about your facility, energy costs, electrical system and what you want to improve. We’ll help identify the most practical path.
